Building Terms
There are 734 entries in this glossary.All
| Term | Definition |
|---|---|
| Backout |
Work the framing contractor does after the mechanical subcontractors (Heating-Plumbing-Electrical) finish their phase of work at the Rough (before insulation) stage to get the home ready for a municipal frame inspection. Generally, the framing contractor repairs anything disturbed by others and completes all framing necessary to pass a Rough Frame Inspection. |
Glossary 2.64 is technology by Guru PHP



